Seven project stages
Build the project in the right order
Start with the product and the market, not the machine. Each stage ends with a document you can show to partners, investors and suppliers.
-
Define the product and the market
Round, square, oval, lock-edge and wet compress pads can need different materials, tooling and quality criteria.
- Dimensioned drawing and reference sample
- Material, basis weight, layers and roll format
- Embossing, edge, count and packaging
- Destination markets and product claims
Deliverable: approved product specification
-
Test the commercial case
Capacity is not sales. Model demand, price, materials, labor, utilities, packaging, logistics and working capital.
- Customer pipeline and realistic monthly demand
- SKU mix, order size and changeovers
- Margin and cash-flow assumptions
- Payback at different utilization and prices
Deliverable: business case with sensitivity analysis
-
Choose the process and equipment scope
Decide what is automated now, what stays manual and what can be added later.
- Machine configuration and product range
- Molds and changeover method
- Saleable output under trial conditions
- Manual packing or packaging automation
Deliverable: signed technical scope and equipment list
-
Plan the facility and material flow
Design around hygiene, utilities, safety, maintenance and forklift logistics, with qualified local specialists.
- Raw material, production, packing and dispatch flow
- Floor, power, compressed air and environment
- Guarding, emergency routes and maintenance access
- Waste handling, cleaning and pest control
Deliverable: approved layout and utility schedule
-
Map compliance and quality obligations
Product rules, machine conformity, management systems and site audits are separate. One certificate does not cover all of them.
- Product standards, labeling and market access
- Machine conformity and technical files
- Quality certificate holder and scope
- Customer social-audit requirements
Deliverable: compliance matrix with owners and dates
-
Agree factory acceptance, training and support
Turn promises into measurable acceptance criteria before the machine ships.
- Trial material, drawing and approved sample
- Test duration, speed range and sampling
- Acceptance criteria and allowed variation
- Manuals, training, warranty and spare parts
Deliverable: approved FAT and delivery-document plan
-
Ramp up production under control
Start with controlled batches and scale on data, not on rated speed.
- Incoming material and first-article approval
- Process settings, sampling and traceability
- Operator training and preventive maintenance
- Output, yield and defect review before scale-up
Deliverable: stable operating window and ramp-up plan
Before you order equipment
Eight things to confirm first
Send KNK these answers and we can propose an exact machine configuration, tooling list and layout.
Product
Product specification
Diameter or size, lock-edge type, embossing pattern, layers and thickness.
Capacity
Target output
Saleable pcs per day, shift pattern and expected changeovers, not just rated speed.
Demand
Who will buy it
Realistic customers, volumes, prices and their qualification requirements.
Site
Factory conditions
Floor space, stable AC 380V 50Hz power, compressed air, staffing and maintenance access.
Packing
Packaging method
Pack count, bag type, labels and whether packaging automation will follow.
Tooling
Molds
Each shape and size needs its own embossing, lock-edge and cutting rollers.
Yield
Waste handling
Round pads leave edge and skeleton waste. Plan collection and reuse from day one.
Cash
Full project budget
Machine, tooling, shipping, installation, materials, working capital and ramp-up.
Factory layout
A proven layout for one KNK-310 line
Material moves in one direction, from roll staging to dispatch, so forklifts, operators and maintenance never cross paths.
- Raw material staging
- Splicing and feeding
- KNK-310 main unit
- Manual packing station
- Finished goods dispatch
Footprint
At least 7 × 4 m per line
The main machine measures 4950 × 1210 × 1700 mm. Reserve at least 7 × 4 m for safe roll loading, packing and maintenance access.
Utilities
Power and compressed air
Stable AC 380V supply with panels away from traffic, and overhead piping for 0.6–0.8 MPa compressed air that stays clear of forklift routes.
Environment
A clean, separated zone
A cleanroom is optional, but a separated, ventilated and dust-controlled processing area makes customer and SMETA audits much easier.
Recommended machine
KNK-310 at a glance
Start with a semi-automatic setup: the KNK-310 automates forming, cutting, counting and stacking, while final packing stays manual until your volumes and pack formats are proven.
| Machine type | Hot-melt cotton pad die-cutting machine |
|---|---|
| Material width | Up to 310 mm |
| Output | Up to 2,000 pcs/min on the latest model (previous model up to 1,500 pcs/min) |
| Core functions | Unwinding, embossing, hot-melt lamination, lock-edge forming, die cutting, counting, staggered output |
| Products | Round, square and embossed multilayer cosmetic cotton pads |
| Main machine size | 4950 × 1210 × 1700 mm |
| Utilities | AC 380V 50Hz, compressed air 0.6–0.8 MPa |
| Operators | From 2, depending on speed and packing method |
Documents
Know what each document proves
Check the legal entity, site, product, machine model, scope and validity behind every certificate you are shown.
Product
Market requirements
Material, intended use, claims, labeling, hygiene, testing and traceability in your destination market.
Machine
CE conformity
Covers the identified machine model and configuration under the relevant requirements.
Management system
ISO certification
Check the certificate holder, standard, certified activities, issuing body and validity.
Site audit
SMETA
An audit of a named site. It is not a product certificate or a general company approval.
Who does what
What KNK handles and what stays with you
KNK delivers
- Machine configuration and technical proposal
- Tooling concept from your product drawing
- Factory layout and utility information
- FAT, documentation, training and after-sales service
You own
- Product specification and market compliance
- Factory approvals, utilities and local safety
- Materials, staffing, packaging and logistics
- Funding and the final investment decision
This guide is general planning information. It is not legal, regulatory, financial or investment advice. Use qualified local advisers for permits, building, safety and environmental requirements.
Run the numbers
Budget, ROI and market models
Planning a new cotton pad factory?